IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0335 # 02 Y:2004 02 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $44,300 $205,000 Not Implemented
UF0335 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,089 $41,729 Implemented
UF0335 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,790 $13,573 Implemented
UF0335 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,008 $0 Not Implemented
UF0335 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,359 $376 Implemented
UF0335 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $3,237 $20,000 Implemented
UF0334 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,397 $57,060 Implemented
UF0334 # 02 Y:2003 02 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,095 $2,128 Implemented
UF0334 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,612 $0 Implemented
UF0334 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,681 $376 Implemented
UF0334 # 05 Y:2003 05 2003 SEGREGATE SPENT SOLVENTS AND REUSE IN SUBSEQUENT WASHINGS $33,833 $43,600 Implemented
UF0334 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $82,333 $168,000 Implemented
UF0333 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,176 $13 n/a
UF0333 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,653 $16,060 n/a
UF0333 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $4,492 $4,010 n/a
UF0333 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,886 $626 n/a
UF0333 # 05 Y:2003 05 2003 METER WASTE WATER $1,545 $1,700 n/a
UF0333 # 06 Y:2003 06 2003 INSTALL BACK-UP EQUIPMENT $22,100 $120,000 n/a
MI0069 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,943 $600 Not Implemented
MI0069 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $37,385 $2,100 Implemented
MI0069 # 03 Y:2003 03 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,200 $3,222 Not Implemented
MI0069 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,203 $3,536 Implemented
MI0069 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $11,691 $0 Implemented
MI0069 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $1,608 Not Implemented
MI0069 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $68,389 $68,389 Not Implemented