Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0293 # 04 Y:1997 | 04 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $13,037 | $500 | n/a |
WI0293 # 05 Y:1997 | 05 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,025 | $3,544 | n/a |
WI0293 # 06 Y:1997 | 06 | 1997 | USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS | $7,350 | $4,000 | n/a |
WI0293 # 07 Y:1997 | 07 | 1997 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,404 | $0 | n/a |
WI0293 # 08 Y:1997 | 08 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,600 | $0 | n/a |
WI0293 # 09 Y:1997 | 09 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,450 | $180 | n/a |
WI0293 # 10 Y:1997 | 10 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $626 | $1,280 | n/a |
WI0293 # 11 Y:1997 | 11 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,976 | $8,000 | n/a |
WI0293 # 12 Y:1997 | 12 | 1997 | MINIMIZE WATER USAGE | $1,853 | $0 | n/a |
WI0293 # 13 Y:1997 | 13 | 1997 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,412 | $0 | n/a |
WI0293 # 14 Y:1997 | 14 | 1997 | INSTALL OCCUPANCY SENSORS | $308 | $225 | n/a |
TN0605 # 01 Y:1997 | 01 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $104,110 | $129,700 | Implemented |
TN0605 # 02 Y:1997 | 02 | 1997 | REDUCE SCRAP PRODUCTION | $100,760 | $25,700 | Implemented |
TN0605 # 03 Y:1997 | 03 | 1997 | KEEP BOILER TUBES CLEAN | $39,970 | $70,960 | Implemented |
TN0605 # 04 Y:1997 | 04 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,910 | $1,330 | Implemented |
TN0605 # 05 Y:1997 | 05 | 1997 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,880 | $25,180 | Not Implemented |
TN0605 # 06 Y:1997 | 06 | 1997 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $5,430 | $14,800 | Not Implemented |
HO0151 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,364 | $5,745 | Implemented |
HO0151 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $375 | $400 | Implemented |
HO0151 # 03 Y:1997 | 03 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,900 | $6,500 | Not Implemented |
HO0151 # 04 Y:1997 | 04 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $31,200 | $5,400 | Not Implemented |
DS0086 # 01 Y:1997 | 01 | 1997 | OPTIMIZE PLANT POWER FACTOR | $6,948 | $3,808 | Implemented |
DS0086 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $960 | $0 | Implemented |
DS0086 # 03 Y:1997 | 03 | 1997 | INSULATE BARE EQUIPMENT | $1,477 | $2,969 | Implemented |
DS0086 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,631 | $450 | Implemented |