IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0660 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,779 $0 Implemented
UD0660 # 03 Y:2003 03 2003 FILTER AND REUSE HYDRAULIC OIL $19,375 $4,323 Not Implemented
UD0660 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $15,291 $7,000 Not Implemented
UD0660 # 05 Y:2003 05 2003 REDUCE VENTILATION AIR $8,388 $15,000 Implemented
UD0660 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,666 $1,124 Not Implemented
UD0660 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,568 $6,545 Not Implemented
UD0660 # 08 Y:2003 08 2003 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,026 $8,400 Implemented
UD0660 # 09 Y:2003 09 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,983 $14,150 Not Implemented
UD0660 # 10 Y:2003 10 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,648 $0 Not Implemented
BD0226 # 01 Y:2003 01 2003 USE RADIANT HEATER FOR SPOT HEATING $17,147 $11,000 Not Implemented
BD0226 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,838 $1,200 Implemented
BD0226 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,169 $500 Not Implemented
BD0226 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $0 Implemented
BD0226 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $545 $1,250 Implemented
BD0226 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74 $290 Not Implemented
BD0226 # 07 Y:2003 07 2003 RECYCLE CASTING SAND $9,750 $1,000 Implemented
BD0226 # 08 Y:2003 08 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $28,125 $1,000 Implemented
BD0226 # 09 Y:2003 09 2003 $25,480 $2,500 Implemented
AM0429 # 01 Y:2003 01 2003 $13,000 $0 Not Implemented
AM0429 # 02 Y:2003 02 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $2,770 $7,800 Not Implemented
AM0429 # 03 Y:2003 03 2003 UPGRADE OBSOLETE EQUIPMENT $830 $6,540 Not Implemented
AM0429 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $200 Implemented
AM0429 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $101 $0 Not Implemented
LL0155 # 01 Y:2003 01 2003 REPLACE BOILER $17,740 $33,000 Not Implemented
LL0155 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,929 $975 Implemented