IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50,367

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0100 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $407 $150 Implemented
TT0100 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $4,500 Implemented
TT0100 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $360 Implemented
TT0100 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $3,000 Implemented
UA3024 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200,861 $1,600 Not Implemented
UA3024 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $85,875 $23,130 Not Implemented
UA3024 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,436 $2,500 Implemented
UA3024 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $15,748 $2,000 Not Implemented
UA3024 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,972 $54,662 Not Implemented
UA3024 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,128 $66,849 Not Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
AM0623 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,800 $13,240 Not Implemented
AM0623 # 03 Y:2012 03 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $36,640 $10,000 Not Implemented
AM0623 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,838 $500 Not Implemented
AM0623 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,538 $1,045 Not Implemented
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented
AM0623 # 07 Y:2012 07 2012 TREAT AND REUSE RINSE WATERS $3,300 $3,000 Not Implemented
AM0623 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $3,100 $570 Not Implemented
AM0623 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $1,010 $0 Not Implemented
DL0096 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,429 $30,095 Implemented
DL0096 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,176 $8,000 Implemented
DL0096 # 03 Y:2012 03 2012 KEEP EQUIPMENT CLEAN $2,296 $1,200 Implemented
DL0096 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,791 $500 Implemented
DL0096 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $766 $270 Not Implemented
IA0489 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,668 $385 Not Implemented