Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0680 # 02 Y:2000 | 02 | 2000 | MODIFY CURRENT INCENTIVE PROGRAM | $37,500 | $16,430 | Implemented |
TN0680 # 03 Y:2000 | 03 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $30,832 | $1,075 | Not Implemented |
TN0680 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,356 | $18,370 | Not Implemented |
TN0680 # 05 Y:2000 | 05 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,810 | $500 | Implemented |
TN0680 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $960 | $0 | Not Implemented |
WI0366 # 01 Y:2000 | 01 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $23,840 | $71,500 | Not Implemented |
WI0366 # 02 Y:2000 | 02 | 2000 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $23,087 | $0 | Not Implemented |
WI0366 # 03 Y:2000 | 03 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,458 | $3,013 | Not Implemented |
WI0366 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,884 | $0 | Not Implemented |
WI0366 # 05 Y:2000 | 05 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $2,628 | $6,060 | Not Implemented |
WI0366 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,996 | $4,934 | Not Implemented |
WI0366 # 07 Y:2000 | 07 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,500 | $0 | Not Implemented |
SD0237 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,985 | $88,000 | Implemented |
SD0237 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,408 | $2,800 | Implemented |
SD0237 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $688 | $100 | Implemented |
SD0237 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,766 | $9,903 | Not Implemented |
SD0237 # 05 Y:2000 | 05 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,525 | $6,910 | Not Implemented |
SD0237 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,740 | $8,500 | Not Implemented |
SD0237 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $646 | $100 | Implemented |
SD0237 # 08 Y:2000 | 08 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,972 | $7,200 | Implemented |
SD0237 # 09 Y:2000 | 09 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $20,236 | $26,000 | Not Implemented |
HO0223 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $952 | $4,794 | Not Implemented |
HO0223 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,239 | $144 | Not Implemented |
HO0223 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $642 | $1,500 | Implemented |
HO0223 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $513 | $0 | Implemented |