IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1082 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,243 $0 Not Implemented
OK1082 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,475 $36,319 Implemented
OK1083 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,764 $522 Not Implemented
OK1083 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,133 $12,880 Not Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
OK1083 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $491,204 $4,927,139 Not Implemented
OK1083 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $926 $2,799 Implemented
LE0537 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $167,234 $0 Implemented
LE0537 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,776 $15,000 Not Implemented
LE0537 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $825 $570 Implemented
LE0537 # 04 Y:2023 04 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,501 $7,500 Not Implemented
LE0537 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,193 $7,500 Not Implemented
LE0537 # 06 Y:2023 06 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $23,891 $70,000 Not Implemented
LE0537 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,096 $67,533 Implemented
LE0537 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,920 $245,000 Implemented
OK1081 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $15,211 $2,252 Not Implemented
OK1081 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,608 $0 Implemented
OK1081 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,617 $218,400 Not Implemented
OK1081 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $1,230 Not Implemented
OK1081 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,026 $7,020 Implemented
OK1081 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,097 $11,114 Implemented
OK1081 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $600 Implemented
OK1081 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $3,920 $4,024 Not Implemented
SF0593 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,621 $0 Implemented
SF0593 # 02 Y:2023 02 2023 COVER OPEN TANKS $5,939 $1,586 Not Implemented