IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,378

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0013 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $733 $0 Not Implemented
SJ0013 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,579 $0 Not Implemented
SJ0013 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $22 Not Implemented
SJ0013 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,399 $1,473 Not Implemented
SJ0013 # 09 Y:2024 09 2024 COMBINE UTILITY METERS $454 $0 Not Implemented
SU0546 # 01 Y:2023 01 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,882 $0 Not Implemented
SU0546 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $626 $0 Implemented
SU0546 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,466 $100 Not Implemented
SU0546 # 04 Y:2023 04 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $559 $253 Not Implemented
IC0296 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $5,921 $1,066 Implemented
IC0296 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,196 $12,921 Not Implemented
IC0296 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,777 $8,406 Implemented
IC0296 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,324 $400 Implemented
IC0296 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $7,015 $9,479 Not Implemented
IC0296 # 06 Y:2024 06 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,898 $23,884 Implemented
IC0296 # 07 Y:2024 07 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $465,211 $3,649,800 Not Implemented
IC0296 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $271,456 $1,202,972 Not Implemented
IC0296 # 09 Y:2024 09 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,421 $0 Implemented
IC0296 # 10 Y:2024 10 2024 REPLACE BOILER $112,681 $127,793 Not Implemented
IC0296 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $2,446 $608 Implemented
IC0296 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,022 $1,150 Implemented
IC0296 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $7,154 $1,011 Implemented
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $40,554 $187,200 Not Implemented
OK1106 # 03 Y:2024 03 2024 USE RADIANT HEATER FOR SPOT HEATING $2,649 $5,850 Not Implemented