IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0400 # 05 Y:2015 05 2015 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,027 $5,000 Not Implemented
LE0400 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,922 $10,500 Not Implemented
LE0400 # 07 Y:2015 07 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,457 $3,025 Implemented
LE0400 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,074 $35,000 Not Implemented
LE0400 # 09 Y:2015 09 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,334 $16,500 Implemented
LE0400 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,729 $48,067 Implemented
LE0400 # 11 Y:2015 11 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $42,371 $95,000 Not Implemented
LE0400 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,188 $5,469 Implemented
LE0400 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,886 $69,160 Implemented
LE0400 # 14 Y:2015 14 2015 USE RADIANT HEATER FOR SPOT HEATING $5,902 $24,000 Implemented
LE0400 # 15 Y:2015 15 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,678 $6,940 Implemented
LE0400 # 16 Y:2015 16 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,312 $35,000 Implemented
LE0398 # 01 Y:2015 01 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $21,570 $12,000 Not Implemented
LE0398 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $903 $525 Implemented
LE0398 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,761 $2,125 Not Implemented
LE0398 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,857 $14,800 Not Implemented
LE0398 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $884 Not Implemented
LE0398 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $205 $600 Not Implemented
LE0398 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $3,725 Not Implemented
LE0398 # 08 Y:2015 08 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $29,538 $129,220 Not Implemented
LE0398 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,157 $27,450 Not Implemented
LE0398 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $8,550 Not Implemented
LE0399 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $2,461 $240 Implemented
LE0399 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,851 $250 Implemented
LE0399 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,048 $1,000 Implemented