Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,851
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0267 # 06 Y:2022 | 06 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,445 | $5,000 | Not Implemented |
TT0267 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,489 | $1,920 | Not Implemented |
TT0267 # 08 Y:2022 | 08 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,797 | $5,000 | Not Implemented |
TT0271 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,479 | $1,500 | Implemented |
TT0271 # 02 Y:2022 | 02 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,358 | $15,000 | Not Implemented |
TT0271 # 03 Y:2022 | 03 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,012 | $0 | Implemented |
TT0271 # 04 Y:2022 | 04 | 2022 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $2,610 | $12,000 | Not Implemented |
TT0271 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,410 | $3,000 | Implemented |
TT0271 # 06 Y:2022 | 06 | 2022 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,316 | $1,500 | Implemented |
TT0271 # 07 Y:2022 | 07 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,050 | $640 | Not Implemented |
TT0271 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $1,262 | Not Implemented |
TT0271 # 09 Y:2022 | 09 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $435 | $200 | Implemented |
TT0271 # 10 Y:2022 | 10 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $237 | $600 | Implemented |
TT0266 # 01 Y:2022 | 01 | 2022 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $32,000 | $3,900 | Implemented |
TT0266 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,120 | $138,300 | Not Implemented |
TT0266 # 03 Y:2022 | 03 | 2022 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,496 | $2,400 | Implemented |
TT0266 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,458 | $6,147 | Implemented |
TT0266 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,049 | $1,100 | Implemented |
TT0263 # 01 Y:2021 | 01 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $45,807 | $72,000 | Not Implemented |
TT0263 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,663 | $88,815 | Implemented |
TT0263 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,566 | $6,725 | Not Implemented |
TT0263 # 04 Y:2021 | 04 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $9,686 | $17,700 | Not Implemented |
TT0263 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,140 | $5,000 | Not Implemented |
TT0264 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $179,945 | $100,000 | Implemented |
TT0264 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,057 | $60,000 | Implemented |