Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50,056
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0373 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,188 | $16,280 | n/a |
MZ0373 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $948 | n/a |
MZ0373 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $882 | $1,200 | n/a |
MS0445 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,535 | $200,000 | n/a |
MS0445 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,629 | $44,500 | n/a |
MS0445 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $395 | $0 | n/a |
MS0445 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $40,482 | $25,536 | n/a |
MS0445 # 05 Y:2025 | 05 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $12,178 | $45,000 | n/a |
MS0445 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,573 | $2,502 | n/a |
MS0445 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,723 | $35,999 | n/a |
LE0598 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,559 | $6,000 | n/a |
LE0598 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $37,915 | $27,000 | n/a |
LE0598 # 03 Y:2025 | 03 | 2025 | CONVERT TO ROBOTIC PAINTING | $218,856 | $362,095 | n/a |
LE0598 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $302,215 | $689,368 | n/a |
LE0598 # 05 Y:2025 | 05 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $456,991 | $909,175 | n/a |
LE0598 # 06 Y:2025 | 06 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $11,873 | $25,113 | n/a |
LE0598 # 07 Y:2025 | 07 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $2,194,349 | $9,580,000 | n/a |
SU0569 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,564 | $96 | n/a |
SU0569 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $550 | $0 | n/a |
SU0569 # 03 Y:2025 | 03 | 2025 | INSTALL / REPAIR INSULATION ON STEAM LINES | $516 | $372 | n/a |
SU0569 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,196 | $1,615 | n/a |
SU0569 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $355 | $612 | n/a |
SU0569 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $247 | $451 | n/a |
SU0569 # 07 Y:2025 | 07 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $124 | $343 | n/a |
SU0569 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $151 | $424 | n/a |