Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0230 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,238 | $3,200 | Implemented |
TT0230 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $2,786 | $10,000 | Not Implemented |
TT0230 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,661 | $1,618 | Implemented |
TT0230 # 08 Y:2019 | 08 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $289 | $20 | Implemented |
AM0790 # 01 Y:2019 | 01 | 2019 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,870 | $29,400 | Implemented |
AM0790 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $4,100 | $5,300 | Implemented |
AM0790 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,921 | $12,100 | Implemented |
AM0790 # 04 Y:2019 | 04 | 2019 | USE SYNTHETIC LUBRICANT | $415 | $510 | Implemented |
AM0790 # 05 Y:2019 | 05 | 2019 | USE PHOTOCELL CONTROLS | $235 | $17 | Implemented |
CL1915 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $47,547 | $200,000 | Not Implemented |
CL1915 # 02 Y:2019 | 02 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $15,899 | $5,500 | Implemented |
CL1915 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,751 | $41,281 | Implemented |
CL1915 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,899 | $0 | Implemented |
LE0484 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,910 | $23,990 | Implemented |
LE0484 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,805 | $5,500 | Implemented |
LE0484 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,879 | $51,500 | Implemented |
LE0484 # 07 Y:2019 | 07 | 2019 | BURN A LESS EXPENSIVE GRADE OF FUEL | $87,917 | $290,000 | Implemented |
MA0809 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,376 | $23,715 | Not Implemented |
MA0809 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,745 | $11,800 | Not Implemented |
MA0809 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,332 | $150 | Implemented |
MA0809 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,772 | $1,000 | Implemented |
MA0809 # 05 Y:2019 | 05 | 2019 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,114 | $4,500 | Implemented |
MA0809 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,036 | $3,057 | Implemented |
SF0548 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,764 | $0 | Implemented |
SF0548 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $193 | $0 | Implemented |