Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,022
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0743 # 08 Y:2006 | 08 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $18,000 | $1,750 | Implemented |
UD0743 # 09 Y:2006 | 09 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,000 | $0 | Implemented |
UD0743 # 10 Y:2006 | 10 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $15,000 | $0 | Implemented |
UD0743 # 11 Y:2006 | 11 | 2006 | USE OPTIMUM TEMPERATURE | $13,681 | $0 | Not Implemented |
UD0743 # 12 Y:2006 | 12 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,125 | $12,000 | Not Implemented |
UD0743 # 13 Y:2006 | 13 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $8,946 | $0 | Not Implemented |
UD0743 # 14 Y:2006 | 14 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,158 | $15,600 | Not Implemented |
UD0743 # 15 Y:2006 | 15 | 2006 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $4,060 | $10,000 | Not Implemented |
UD0743 # 16 Y:2006 | 16 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,181 | $12,130 | Not Implemented |
UD0743 # 17 Y:2006 | 17 | 2006 | USE PHOTOCELL CONTROLS | $2,428 | $1,776 | Not Implemented |
UD0743 # 18 Y:2006 | 18 | 2006 | USE PHOTOCELL CONTROLS | $2,147 | $0 | Not Implemented |
UD0743 # 19 Y:2006 | 19 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,710 | $0 | Not Implemented |
UD0743 # 20 Y:2006 | 20 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,342 | $500 | Implemented |
UD0743 # 21 Y:2006 | 21 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $831 | $0 | Implemented |
UM0301 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $9,958 | $30,000 | Not Implemented |
UM0301 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $6,754 | $1,971 | Implemented |
UM0301 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,429 | $9,875 | Not Implemented |
UM0301 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,344 | $500 | Not Implemented |
UM0301 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,457 | $375 | Implemented |
UM0301 # 06 Y:2006 | 06 | 2006 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,498 | $738 | Not Implemented |
UM0301 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,325 | $0 | Implemented |
UM0301 # 08 Y:2006 | 08 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,415 | $1,363 | Not Implemented |
UM0301 # 09 Y:2006 | 09 | 2006 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $328 | $328 | Not Implemented |
UM0301 # 10 Y:2006 | 10 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,062 | $300 | Not Implemented |
UM0301 # 11 Y:2006 | 11 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $218 | $500 | Not Implemented |