IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0195 # 07 Y:1999 07 1999 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,192 $5,000 Not Implemented
HO0195 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,248 $2,500 Not Implemented
IA0215 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,169 $382 Implemented
IA0215 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,587 $2,500 Implemented
IA0215 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $2,904 $3,300 Not Implemented
IA0215 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,498 $11,043 Implemented
IA0215 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $640 Not Implemented
IA0215 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $2,184 Implemented
IA0215 # 07 Y:1999 07 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $50 Not Implemented
IA0215 # 08 Y:1999 08 1999 INSTALL OCCUPANCY SENSORS $294 $1,264 Implemented
IA0215 # 09 Y:1999 09 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $264 $102 Implemented
IA0215 # 10 Y:1999 10 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $35,000 $7,000 Not Implemented
ME0260 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,561 $11,150 Not Implemented
ME0260 # 02 Y:1999 02 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,589 $2,480 Not Implemented
ME0260 # 03 Y:1999 03 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,693 $3,398 Not Implemented
ME0260 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $585 $171 Implemented
ME0260 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $657 $720 Not Implemented
ME0260 # 06 Y:1999 06 1999 COMBINE UTILITY METERS $456 $230 Not Implemented
ME0260 # 07 Y:1999 07 1999 RECOVER AND REUSE COOLING WATER $352 $350 Not Implemented
WI0340 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,153 $30,618 Implemented
WI0340 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,971 $0 Not Implemented
WI0340 # 03 Y:1999 03 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,819 $6,000 Not Implemented
WI0340 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,051 $0 Implemented
WI0340 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $2,000 Implemented
WI0340 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $542 $740 Not Implemented