IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0158 # 01 Y:2000 01 2000 REPAIR OR REPLACE STEAM TRAPS $67,296 $2,200 Implemented
UM0158 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,190 $1,400 Not Implemented
UM0158 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $138,702 $86,970 Implemented
UM0158 # 04 Y:2000 04 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $11,891 $9,860 Not Implemented
UM0158 # 05 Y:2000 05 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $106,009 $100,000 Not Implemented
UM0158 # 06 Y:2000 06 2000 REDUCE FLUID FLOW RATES $40,377 $1,000 Not Implemented
UM0158 # 07 Y:2000 07 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $364,003 $3,000,000 Not Implemented
UM0157 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $150 Implemented
UM0157 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $500 Implemented
UM0157 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,224 $4,430 Implemented
UM0157 # 04 Y:2000 04 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,000 $400 Not Implemented
UM0157 # 05 Y:2000 05 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,296 $738 Implemented
AM0367 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,240 $565 Implemented
AM0367 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,560 $0 Implemented
AM0367 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,090 $500 Implemented
AM0367 # 04 Y:2000 04 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $560 $0 Implemented
AM0367 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $505 $290 Implemented
AM0367 # 06 Y:2000 06 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $355 $0 Implemented
AM0367 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $234 $0 Implemented
AM0367 # 08 Y:2000 08 2000 USE SYNTHETIC LUBRICANT $130 $0 Implemented
GT0683 # 01 Y:2000 01 2000 COMBINE UTILITY METERS $14,609 $0 Not Implemented
GT0683 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $180,287 $358,400 Not Implemented
GT0683 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,689 $2,080 Not Implemented
GT0683 # 04 Y:2000 04 2000 INSTALL SYSTEM TO COLLECT SCRAP $59,893 $12,000 Not Implemented
GT0683 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,590 $108,696 Not Implemented