IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0256 # 09 Y:2003 09 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $752 $40 Implemented
WV0256 # 10 Y:2003 10 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,043 $1,000 Implemented
OK0653 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,530 $6,844 Not Implemented
OK0653 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $14,697 $8,210 Implemented
OK0653 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,582 $600 Not Implemented
OK0653 # 04 Y:2003 04 2003 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,904 $13,860 Not Implemented
OK0653 # 05 Y:2003 05 2003 INSTALL SET-BACK TIMERS $5,337 $3,280 Not Implemented
OK0653 # 06 Y:2003 06 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $25,432 $4,800 Not Implemented
OK0653 # 07 Y:2003 07 2003 AUTOMATE FINISHING PROCESS $36,680 $73,250 Not Implemented
SD0311 # 01 Y:2003 01 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,146 $19,000 Not Implemented
SD0311 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $3,064 $2,000 Implemented
SD0311 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Implemented
SD0311 # 04 Y:2003 04 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,622 $5,000 Implemented
SD0311 # 05 Y:2003 05 2003 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $31,104 $0 Not Implemented
CO0520 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $12,470 $10,000 Not Implemented
CO0520 # 02 Y:2003 02 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,530 $39,900 Not Implemented
CO0520 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $508 Not Implemented
CO0520 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $260 Implemented
CO0520 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $410 $260 Not Implemented
IA0310 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,362 $29,292 Not Implemented
IA0310 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,338 $5,828 Implemented
IA0310 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $214 $266 Implemented
IA0310 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $807 $25 Not Implemented
IA0310 # 05 Y:2003 05 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,468 $7,349 Implemented
IA0310 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $204 $0 Implemented