IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0310 # 08 Y:2003 08 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $2,267 $1,000 Not Implemented
IA0310 # 09 Y:2003 09 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,994 $2,000 Not Implemented
IA0310 # 10 Y:2003 10 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,819 $16,000 Not Implemented
LE0151 # 01 Y:2003 01 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,947 $3,000 Implemented
LE0151 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,069 $0 Not Implemented
LE0151 # 03 Y:2003 03 2003 USE OPTIMUM THICKNESS INSULATION $51,426 $6,735 Implemented
LE0151 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $7,733 $1,000 Not Implemented
LE0151 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,064 $4,425 Implemented
LE0151 # 06 Y:2003 06 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,947 $0 Not Implemented
LE0151 # 07 Y:2003 07 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,270 $0 Not Implemented
LE0151 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,121 $1,000 Implemented
IA0310 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,362 $29,292 Not Implemented
AS0341 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,096 $6,789 Not Implemented
AS0341 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $834 $891 Not Implemented
AS0341 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $40 Implemented
AS0341 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,287 $260 Implemented
AS0341 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $193 $442 Not Implemented
AS0341 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $20,939 $0 Not Implemented
AS0341 # 07 Y:2003 07 2003 $23,277 $14,364 Not Implemented
AS0341 # 08 Y:2003 08 2003 $40,000 $616 Not Implemented
WV0255 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $310 Not Implemented
WV0255 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,774 $100 Implemented
WV0255 # 03 Y:2003 03 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $965 $2,700 Not Implemented
WV0255 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,019 $200 Not Implemented
WV0255 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,236 $2,025 Implemented