IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0224 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $45,228 $60,000 Not Implemented
TT0224 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,405 $3,200 Implemented
TT0224 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $16,645 Implemented
TT0224 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $14,353 $500 Implemented
TT0224 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,767 $1,910 Not Implemented
TT0224 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $7,188 $600 Not Implemented
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $640 Not Implemented
TT0224 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $40 Not Implemented
SD0581 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,801 $49,815 Implemented
SD0581 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $22,240 $45,000 Implemented
SD0581 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,432 $6,261 Implemented
SD0581 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $1,448 $2,880 Implemented
SD0581 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $712 $2,580 Implemented
MA0803 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,194 $11,175 Implemented
MA0803 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,308 $1,000 Implemented
MA0803 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $3,589 Implemented
MA0803 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $525 $2,000 Not Implemented
IC0216 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $8,388 $10,700 Implemented
IC0216 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,893 $2,460 Not Implemented
IC0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,900 $3,585 Implemented
IC0216 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $1,942 $15,000 Not Implemented
SF0540 # 01 Y:2019 01 2019 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,623 $0 Implemented
SF0540 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $0 Implemented
SF0540 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,339 $325 Implemented