Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0056 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,678 | $250 | Implemented |
WV0056 # 03 Y:1995 | 03 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,010 | $800 | Not Implemented |
WV0056 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,481 | $1,482 | Implemented |
WV0056 # 05 Y:1995 | 05 | 1995 | USE SYNTHETIC LUBRICANT | $2,144 | $0 | Implemented |
WV0056 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,014 | $800 | Not Implemented |
WV0056 # 07 Y:1995 | 07 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,331 | $2,659 | Not Implemented |
WV0056 # 08 Y:1995 | 08 | 1995 | CONVERT TO AQUEOUS CLEANING SYSTEM | $30,701 | $60,000 | Not Implemented |
WV0056 # 09 Y:1995 | 09 | 1995 | USE EVAPORATION TO CONCENTRATE MATERIAL | $66,455 | $6,100 | Not Implemented |
WV0056 # 10 Y:1995 | 10 | 1995 | USE LESS WASTEFUL PACKAGING | $9,764 | $0 | Not Implemented |
WV0056 # 11 Y:1995 | 11 | 1995 | USE LESS WASTEFUL PACKAGING | $5,696 | $0 | Not Implemented |
SF0052 # 01 Y:1995 | 01 | 1995 | INSULATE BARE EQUIPMENT | $390 | $1,548 | Not Implemented |
SF0052 # 02 Y:1995 | 02 | 1995 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $826 | $2,750 | Not Implemented |
SF0052 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,925 | $13,715 | Implemented |
SF0052 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $808 | $1,116 | Implemented |
SF0052 # 05 Y:1995 | 05 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $830 | $1,650 | Implemented |
SF0052 # 06 Y:1995 | 06 | 1995 | OPTIMIZE PLANT POWER FACTOR | $2,861 | $5,341 | Not Implemented |
SF0052 # 07 Y:1995 | 07 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $71,273 | $230,000 | Not Implemented |
NV0023 # 01 Y:1995 | 01 | 1995 | PAY UTILITY BILLS ON TIME | $1,013 | $0 | Implemented |
NV0023 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,321 | $461 | Not Implemented |
NV0023 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $1,781 | $1,245 | Implemented |
NV0023 # 04 Y:1995 | 04 | 1995 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $4,488 | $1,600 | Not Implemented |
NV0023 # 05 Y:1995 | 05 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $31,162 | $100,000 | Not Implemented |
NV0023 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $2,296 | $224 | Not Implemented |
NV0023 # 07 Y:1995 | 07 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,613 | $694 | Not Implemented |
NV0023 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $424 | $100 | Implemented |