IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0255 # 06 Y:2003 06 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,452 $2,000 Implemented
WV0255 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,449 $2,455 Not Implemented
WV0255 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,094 $1,000 Implemented
WV0255 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $0 Implemented
WV0255 # 10 Y:2003 10 2003 REDUCE EXCESS STEAM BLEEDING $4,622 $80,000 Not Implemented
WV0255 # 11 Y:2003 11 2003 MINIMIZE WATER USAGE $315,882 $25,000 Not Implemented
UU0038 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,172 $948 Not Implemented
UU0038 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,938 $4,181 Not Implemented
UU0038 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,673 $190 Implemented
UU0038 # 04 Y:2003 04 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $710 $600 Not Implemented
UU0038 # 05 Y:2003 05 2003 INSTALL SKYLIGHTS $11,724 $16,000 Not Implemented
UU0038 # 06 Y:2003 06 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,359 $600 Not Implemented
UU0038 # 07 Y:2003 07 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $897 $4,226 Not Implemented
UU0038 # 08 Y:2003 08 2003 ELIMINATE/REDUCE AN OPERATION $600 $500 Not Implemented
SF0252 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,775 $500 Implemented
SF0252 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $814 Not Implemented
SF0252 # 03 Y:2003 03 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $2,342 $4,612 Not Implemented
SF0252 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $846 $2,550 Implemented
SF0252 # 05 Y:2003 05 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $23,641 $205,000 Not Implemented
SU0153 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,642 $93,355 Implemented
SU0153 # 02 Y:2003 02 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,094 $93,819 Not Implemented
SU0153 # 03 Y:2003 03 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $30,876 $11,602 Implemented
SU0153 # 04 Y:2003 04 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,993 $7,176 Not Implemented
SU0153 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,229 $438 Implemented
SU0153 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $5,043 $16,501 Implemented