IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0035 # 12 Y:1985 12 1985 REDUCE GLAZED AREAS IN BUILDINGS $1,130 $4,848 Not Implemented
ST0035 # 13 Y:1985 13 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $9,670 $136 Not Implemented
ST0035 # 14 Y:1985 14 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,586 $3,500 Implemented
ST0037 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,504 $858 Not Implemented
ST0037 # 02 Y:1985 02 1985 UPGRADE OBSOLETE EQUIPMENT $43,200 $19,000 Not Implemented
ST0037 # 03 Y:1985 03 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $300 Not Implemented
ST0037 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $64 Implemented
ST0037 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $266 $0 Implemented
ST0037 # 06 Y:1985 06 1985 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,243 $1,200 Not Implemented
ST0037 # 07 Y:1985 07 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $275 $410 Implemented
ST0037 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,124 $2,000 Implemented
ST0037 # 09 Y:1985 09 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,039 $0 Implemented
ST0037 # 10 Y:1985 10 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,363 $7,500 Not Implemented
ST0037 # 11 Y:1985 11 1985 INSTALL AUTOMATIC STACK DAMPER $331 $400 Not Implemented
ST0037 # 12 Y:1985 12 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,762 $884 Implemented
ST0023 # 01 Y:1985 01 1985 AIR CONDITION ONLY SPACE NECESSARY $1,091 $125 Implemented
ST0023 # 02 Y:1985 02 1985 INSTALL AUTOMATIC STACK DAMPER $8,365 $26,400 Not Implemented
ST0023 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,753 $0 Implemented
ST0023 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,538 $6,448 Implemented
ST0023 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,180 $96 Implemented
ST0023 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $266 $182 Not Implemented
ST0023 # 07 Y:1985 07 1985 INSTALL SOLID WASTE INCINERATOR FOR HEAT $55,176 $50,000 Not Implemented
ST0023 # 08 Y:1985 08 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,472 $0 Implemented
ST0023 # 09 Y:1985 09 1985 RECOVER WASTE HEAT FROM EQUIPMENT $738 $2,000 Implemented
ST0023 # 10 Y:1985 10 1985 USE COMPRESSOR AIR FILTERS $479 $120 Implemented