IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0153 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,900 $16,700 Implemented
SU0153 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,098 $12,105 Not Implemented
SU0153 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $163 Implemented
SU0153 # 10 Y:2003 10 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $882 $249 Not Implemented
UF0313 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,514 $1,631 Implemented
UF0313 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,785 $1,826 Implemented
UF0313 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,093 $31,024 Not Implemented
UF0313 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $13,902 $27,000 Not Implemented
UF0313 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $7,223 $973 Implemented
UF0313 # 06 Y:2003 06 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $19,080 $34,976 Not Implemented
UF0313 # 07 Y:2003 07 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $333,770 $250,000 Not Implemented
UF0313 # 08 Y:2003 08 2003 INSTALL BACK-UP EQUIPMENT $57,960 $109,500 Implemented
UF0313 # 09 Y:2003 09 2003 INSTALL SYSTEM TO COLLECT SCRAP $1,808 $700 Implemented
UM0224 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,438 $21,682 Not Implemented
UM0224 # 02 Y:2003 02 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,265 $700 Not Implemented
UM0224 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $21,643 $15,930 Implemented
UM0224 # 04 Y:2003 04 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,840 $5,520 Implemented
UM0224 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $26,100 $7,230 Implemented
UM0224 # 06 Y:2003 06 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $57,600 $19,600 Not Implemented
UM0224 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,606 $934 Implemented
UM0224 # 08 Y:2003 08 2003 INSTALL STEAM TRAP $1,031 $4,360 Not Implemented
UM0224 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,650 $120 Implemented
UM0224 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $53,338 $12,600 Not Implemented
UM0224 # 11 Y:2003 11 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,270 $10,000 Not Implemented
UM0224 # 12 Y:2003 12 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,000 $2,500 Implemented