IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0201 # 11 Y:1994 11 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $437 $1,023 Implemented
WI0201 # 12 Y:1994 12 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $171 $640 Not Implemented
MO0110 # 01 Y:1994 01 1994 USE RADIANT HEATER FOR SPOT HEATING $13,598 $32,200 Not Implemented
MO0110 # 02 Y:1994 02 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $140 $80 Implemented
MO0110 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,941 $22,684 Not Implemented
MO0110 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,377 $1,232 Implemented
MO0110 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,882 $4,863 Implemented
MO0110 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,789 $350 Implemented
MO0110 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $1,519 $2,083 Implemented
MO0110 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,310 $1,806 Not Implemented
MO0110 # 09 Y:1994 09 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $40 Implemented
MO0110 # 10 Y:1994 10 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $987 $1,093 Implemented
SF0019 # 01 Y:1994 01 1994 USE POWER DURING OFF-PEAK PERIODS $6,225 $4,000 Implemented
SF0019 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,939 $800 Implemented
SF0019 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,685 $400 Implemented
SF0019 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $1,671 Implemented
SF0019 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $796 $348 Not Implemented
SF0019 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $384 $745 Implemented
TN0527 # 01 Y:1994 01 1994 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,612 $5,000 Implemented
TN0527 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $4,817 $3,055 Implemented
TN0527 # 03 Y:1994 03 1994 REPAIR AND ELIMINATE STEAM LEAKS $1,930 $450 Implemented
TN0527 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,444 $1,500 Implemented
TN0527 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $360 $160 Implemented
TN0527 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $210 Implemented
TN0527 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $0 Not Implemented