Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0314 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $135,000 | $32,000 | Not Implemented |
UF0313 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,514 | $1,631 | Implemented |
UF0313 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,785 | $1,826 | Implemented |
UF0313 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $58,093 | $31,024 | Not Implemented |
UF0313 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $13,902 | $27,000 | Not Implemented |
UF0313 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $7,223 | $973 | Implemented |
UF0313 # 06 Y:2003 | 06 | 2003 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $19,080 | $34,976 | Not Implemented |
UF0313 # 07 Y:2003 | 07 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $333,770 | $250,000 | Not Implemented |
UF0313 # 08 Y:2003 | 08 | 2003 | INSTALL BACK-UP EQUIPMENT | $57,960 | $109,500 | Implemented |
UF0313 # 09 Y:2003 | 09 | 2003 | INSTALL SYSTEM TO COLLECT SCRAP | $1,808 | $700 | Implemented |
MI0050 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $173,081 | $82,800 | Not Implemented |
MI0050 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $95,397 | $66,000 | Not Implemented |
MI0050 # 03 Y:2002 | 03 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $53,360 | $5,000 | Not Implemented |
MI0050 # 04 Y:2002 | 04 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $10,046 | $21,150 | Not Implemented |
MI0050 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,880 | $2 | Not Implemented |
MI0050 # 06 Y:2002 | 06 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $2,860 | $1,338 | Not Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
UF0311 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,935 | $119,640 | Not Implemented |
UF0311 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $20,300 | $1,640 | Implemented |
UF0311 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $0 | Not Implemented |