Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,738
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1094 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,239 | $12,700 | Not Implemented |
MZ0341 # 02 Y:2023 | 02 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,839 | $3,000 | Not Implemented |
MZ0341 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,080 | $9,000 | Not Implemented |
MZ0341 # 03 Y:2023 | 03 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $12,536 | $16,400 | Not Implemented |
MZ0341 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,207 | $160 | Not Implemented |
LT8366 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,157 | $4,313 | n/a |
LT8366 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,618 | $11,719 | n/a |
LT8366 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $18,863 | $61,076 | n/a |
TT0291 # 01 Y:2023 | 01 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $44,264 | $3,287 | Not Implemented |
TT0291 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM THICKNESS INSULATION | $14,929 | $45,390 | Not Implemented |
TT0291 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,663 | $1,500 | Implemented |
TT0291 # 03 Y:2023 | 03 | 2023 | PURCHASE APPROPRIATELY SIZED MATERIAL | $18,022 | $87,000 | Not Implemented |
TT0291 # 06 Y:2023 | 06 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,088 | $4,500 | Not Implemented |
TT0291 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,378 | $10,100 | Implemented |
LT8363 # 06 Y:2022 | 06 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,817 | $51,385 | n/a |
LT8363 # 04 Y:2022 | 04 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $14,468 | $15,975 | n/a |
LT8363 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $22,308 | $32,500 | n/a |
LT8363 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,542 | $2,945 | n/a |
LT8363 # 02 Y:2022 | 02 | 2022 | CHANGE OPERATING CONDITIONS | $46,622 | $0 | n/a |
LT8363 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,254 | $0 | n/a |
LT8363 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $5,980 | $10,022 | n/a |
OK1043 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,091 | $8,000 | Implemented |
OK1043 # 05 Y:2021 | 05 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,008 | $952 | Not Implemented |
OK1043 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,397 | $2,946 | Implemented |
OK1043 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $331 | $1,650 | Implemented |