Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,750
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,616 | $0 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
UF0623 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,089 | $5,440 | n/a |
UF0622 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,219 | $322,608 | n/a |
UF0622 # 10 Y:2024 | 10 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $46,005 | $0 | n/a |
UF0622 # 09 Y:2024 | 09 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,512 | $11,225 | n/a |
UF0622 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,345 | $12,420 | n/a |
UF0622 # 07 Y:2024 | 07 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $5,875 | $6,148 | n/a |
UF0622 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $13,853 | $3,888 | n/a |
UF0622 # 12 Y:2024 | 12 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $3,200 | $3,200 | n/a |
UF0622 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,371 | $52,879 | n/a |
UF0622 # 05 Y:2024 | 05 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $10,345 | $46,500 | n/a |
UF0622 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,035 | $0 | n/a |
UF0622 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,789 | $25,360 | n/a |
UF0622 # 11 Y:2024 | 11 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $30,240 | $788 | n/a |
UF0621 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,063 | $456 | n/a |
UF0621 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $26,440 | $12,390 | n/a |
UF0621 # 12 Y:2024 | 12 | 2024 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $8,191 | $40,000 | n/a |
UF0621 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $3,868 | n/a |
UF0621 # 08 Y:2024 | 08 | 2024 | DEVELOP STANDARD OPERATING PROCEDURES | $15,000 | $700 | n/a |