Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0188 # 09 Y:1997 | 09 | 1997 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $4,874 | $4,840 | Implemented |
UF0188 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,535 | $3,969 | Implemented |
UF0188 # 03 Y:1997 | 03 | 1997 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $477 | $133 | Implemented |
UF0188 # 11 Y:1997 | 11 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $79,467 | $273,000 | Not Implemented |
UF0188 # 08 Y:1997 | 08 | 1997 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $2,503 | $0 | Implemented |
UF0188 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $635 | $640 | Implemented |
UF0188 # 07 Y:1997 | 07 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,445 | $451 | Implemented |
UF0187 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,078 | $31,777 | Implemented |
UF0187 # 08 Y:1997 | 08 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $35,426 | $50,000 | Implemented |
UF0187 # 03 Y:1997 | 03 | 1997 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $675 | $0 | Implemented |
UF0187 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $1,800 | $3,300 | Not Implemented |
UF0187 # 09 Y:1997 | 09 | 1997 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,212,800 | $23,600 | Not Implemented |
UF0187 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $4,626 | $14,054 | Not Implemented |
UF0187 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $604 | $530 | Implemented |
UF0187 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $763 | $820 | Not Implemented |
UF0187 # 06 Y:1997 | 06 | 1997 | USE WATER-BASED ADHESIVES | $571 | $0 | Implemented |
UF0186 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $2,264 | $1,984 | Implemented |
UF0186 # 05 Y:1997 | 05 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,704 | $9,000 | Not Implemented |
UF0186 # 06 Y:1997 | 06 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $2,700 | $5,800 | Implemented |
UF0186 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,486 | $20,719 | Not Implemented |
UF0186 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $15,189 | $35,749 | Implemented |
UF0186 # 07 Y:1997 | 07 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,376 | $35,000 | Not Implemented |
UF0186 # 08 Y:1997 | 08 | 1997 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,107 | $0 | Not Implemented |
UF0186 # 03 Y:1997 | 03 | 1997 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $313 | $133 | Implemented |
UF0185 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,979 | $1,725 | Implemented |