IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0287 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $920 Implemented
UF0286 # 09 Y:2001 09 2001 USE HIGH PRESSURE WASH SYSTEMS $41,558 $175,800 Not Implemented
UF0286 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,182 $410 Implemented
UF0286 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,470 $8,362 Implemented
UF0286 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,165 $5,237 Not Implemented
UF0286 # 08 Y:2001 08 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,201 $30,000 Implemented
UF0286 # 06 Y:2001 06 2001 ADD AREA LIGHTING SWITCHES $648 $232 Implemented
UF0286 # 07 Y:2001 07 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,353 $15,176 Not Implemented
UF0286 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $16,196 $19,500 Not Implemented
UF0286 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,194 $0 Not Implemented
UF0286 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $1,664 $805 Not Implemented
MI0023 # 01 Y:2001 01 2001 METER WASTE WATER $2,223 $3,650 Not Implemented
MI0023 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $22,932 $2 Not Implemented
MI0023 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,432 $6 Not Implemented
MI0023 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $69,120 $150,000 Not Implemented
MI0023 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,387 $3 Not Implemented
MI0023 # 04 Y:2001 04 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,384 $143 Not Implemented
MI0023 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,831 $1,879 Not Implemented
UF0285 # 09 Y:2001 09 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $20,950 $11,700 Implemented
UF0285 # 05 Y:2001 05 2001 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $7,697 $25,000 Not Implemented
UF0285 # 07 Y:2001 07 2001 PAY BILLS ON TIME TO AVOID LATE FEES $288 $0 Implemented
UF0285 # 08 Y:2001 08 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $4,760 $2,000 Implemented
UF0285 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $1,072 Not Implemented
UF0285 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $669 $101 Implemented
UF0285 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $2,866 $3,569 Not Implemented