Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
453
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0173 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $805 | $660 | Not Implemented |
BD0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,742 | $600 | Implemented |
BD0172 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $1,560 | $1,300 | Not Implemented |
BD0172 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $493 | $500 | Not Implemented |
BD0172 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $314 | $1,000 | Not Implemented |
BD0172 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,601 | $4,250 | Not Implemented |
BD0172 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $771 | $1,425 | Not Implemented |
BD0172 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $258 | $235 | Not Implemented |
BD0172 # 08 Y:2000 | 08 | 2000 | CLEAR AND RENT EXISTING SPACE | $54,000 | $1,000 | Not Implemented |
BD0172 # 05 Y:2000 | 05 | 2000 | INSTALL TURBULATORS | $370 | $800 | Not Implemented |
BD0172 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $26,555 | $5,000 | Not Implemented |
BD0172 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,429 | $600 | Not Implemented |
WI0384 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,107 | $20,000 | Not Implemented |
WI0384 # 01 Y:2000 | 01 | 2000 | INSTALL SENSORS TO DETECT DEFECTS | $141,912 | $70,000 | Not Implemented |
WI0384 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,745 | $640 | Not Implemented |
WI0384 # 08 Y:2000 | 08 | 2000 | INSULATE BARE EQUIPMENT | $1,185 | $427 | Not Implemented |
WI0384 # 04 Y:2000 | 04 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,935 | $3,250 | Not Implemented |
WI0384 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM THICKNESS INSULATION | $370 | $375 | Not Implemented |
WI0384 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,119 | $6,500 | Not Implemented |
WI0384 # 07 Y:2000 | 07 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,623 | $1,033 | Not Implemented |
WI0384 # 05 Y:2000 | 05 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $5,952 | $1,000 | Not Implemented |
BD0171 # 12 Y:2000 | 12 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $350 | $200 | Not Implemented |
BD0171 # 08 Y:2000 | 08 | 2000 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $39,357 | $4,000 | Implemented |
BD0171 # 10 Y:2000 | 10 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $863,728 | $550,000 | Not Implemented |
BD0171 # 09 Y:2000 | 09 | 2000 | MINIMIZE WATER USAGE | $209 | $805 | Implemented |