Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
72
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0589 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,028 | $43,292 | Not Implemented |
OR0589 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,823 | $53,151 | Implemented |
OR0589 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,711 | $6,200 | Implemented |
OR0589 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,386 | $0 | Not Implemented |
OR0585 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,028 | $2,305 | Implemented |
OR0585 # 11 Y:2012 | 11 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $12,086 | $16,390 | Implemented |
OR0585 # 10 Y:2012 | 10 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,580 | $0 | Not Implemented |
OR0585 # 09 Y:2012 | 09 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,083 | $47,838 | Not Implemented |
OR0585 # 08 Y:2012 | 08 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $16,379 | $16,379 | Not Implemented |
OR0585 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $13,449 | $24,282 | Not Implemented |
OR0585 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,942 | $1,000 | Not Implemented |
OR0585 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,171 | $1,000 | Not Implemented |
OR0585 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $1,776 | $500 | Not Implemented |
OR0585 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,690 | $2,000 | Not Implemented |
OR0585 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,836 | $7,417 | Not Implemented |
OR0583 # 06 Y:2012 | 06 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,779 | $6,600 | Implemented |
OR0583 # 05 Y:2012 | 05 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,391 | $3,854 | Implemented |
OR0583 # 04 Y:2012 | 04 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,078 | $500 | Implemented |
OR0583 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,663 | $19,592 | Implemented |
OR0583 # 02 Y:2012 | 02 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,994 | $10,000 | Not Implemented |
OR0583 # 01 Y:2012 | 01 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $3,140 | $2,412 | Implemented |
OR0582 # 04 Y:2012 | 04 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,435 | $34,000 | Not Implemented |
OR0582 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,291 | $23,135 | Not Implemented |
OR0582 # 02 Y:2012 | 02 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $25,857 | $33,400 | Not Implemented |
OR0582 # 01 Y:2012 | 01 | 2012 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $720 | $500 | Not Implemented |