Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0524 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,870 | $756 | Not Implemented |
WV0524 # 09 Y:2016 | 09 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,448 | $1,208 | Not Implemented |
WV0524 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $269 | $370 | Implemented |
WV0523 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,412 | $4,664 | Implemented |
WV0523 # 08 Y:2016 | 08 | 2016 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $654 | $2,700 | Not Implemented |
WV0523 # 07 Y:2016 | 07 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,154 | $500 | Implemented |
WV0523 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,279 | $4,985 | Implemented |
WV0523 # 05 Y:2016 | 05 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,819 | $1,235 | Implemented |
WV0523 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,867 | $2,686 | Implemented |
WV0523 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,250 | $51,000 | Not Implemented |
WV0523 # 01 Y:2016 | 01 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $51,512 | $200,000 | Not Implemented |
WV0522 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $104 | $106 | Implemented |
WV0522 # 08 Y:2016 | 08 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $300 | $543 | Implemented |
WV0522 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $560 | $467 | Implemented |
WV0522 # 06 Y:2016 | 06 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $888 | $504 | Not Implemented |
WV0522 # 05 Y:2016 | 05 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $996 | $1,000 | Implemented |
WV0522 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,154 | $77 | Implemented |
WV0522 # 03 Y:2016 | 03 | 2016 | INSTALL SET-BACK TIMERS | $1,381 | $3,265 | Implemented |
WV0522 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $3,281 | $6,551 | Not Implemented |
WV0522 # 01 Y:2016 | 01 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,759 | $1,510 | Not Implemented |
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,556 | $43,115 | Not Implemented |
WV0518 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,512 | $706 | Implemented |
WV0518 # 02 Y:2016 | 02 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,399 | $914 | Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |