Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |
LS0007 # 03 Y:2017 | 03 | 2017 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,729 | $0 | Implemented |
LS0007 # 01 Y:2017 | 01 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $883 | $0 | Implemented |
LS0007 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $45 | $70 | Not Implemented |
LS0007 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,699 | $22,680 | Not Implemented |
LS0007 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,322 | $1,040 | Not Implemented |
AS0448 # 01 Y:2017 | 01 | 2017 | HEAT WATER WITH EXHAUST HEAT | $6,252 | $11,340 | Not Implemented |
AS0448 # 02 Y:2017 | 02 | 2017 | AIR CONDITION ONLY SPACE NECESSARY | $3,949 | $0 | Implemented |
AS0448 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $479 | $56 | Not Implemented |
AS0448 # 04 Y:2017 | 04 | 2017 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $1,480 | $5,950 | Not Implemented |
AS0448 # 05 Y:2017 | 05 | 2017 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,478 | $3,870 | Not Implemented |
AS0448 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,828 | $11,700 | Implemented |
UK1714 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,475 | $5,000 | Implemented |
UK1714 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,460 | $0 | Implemented |
UK1714 # 04 Y:2017 | 04 | 2017 | REDUCE FLUID FLOW RATES | $5,426 | $0 | Implemented |
UK1714 # 05 Y:2017 | 05 | 2017 | REDESIGN PROCESS | $1,496 | $5,533 | Implemented |
UK1714 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $2,092 | $1,444 | Implemented |
UA0186 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,615 | $4,645 | Implemented |
UA0186 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,673 | $500 | Not Implemented |
UA0186 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $1,872 | $740 | Implemented |
UA0186 # 05 Y:2017 | 05 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $1,297 | $60 | Implemented |
UA0186 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,247 | $52,665 | Not Implemented |
MZ0245 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $13,572 | $12,250 | Not Implemented |