Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
894
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0283 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $792 | $210 | Not Implemented |
ME0283 # 06 Y:2000 | 06 | 2000 | METER WASTE WATER | $853 | $0 | Not Implemented |
ME0280 # 01 Y:1999 | 01 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $243,000 | $20,108 | Implemented |
ME0280 # 02 Y:1999 | 02 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $105,600 | $6,000 | Implemented |
ME0280 # 03 Y:1999 | 03 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $15,000 | $0 | Implemented |
ME0280 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,958 | $28,528 | Implemented |
ME0280 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,204 | $1,000 | Not Implemented |
ME0280 # 06 Y:1999 | 06 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,402 | $4,940 | Implemented |
ME0280 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,000 | Not Implemented |
ME0280 # 08 Y:1999 | 08 | 1999 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,092 | $1,240 | Implemented |
ME0280 # 09 Y:1999 | 09 | 1999 | MODIFY CURRENT INCENTIVE PROGRAM | $55,341 | $30,500 | Implemented |
ME0274 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $27,426 | $27,050 | n/a |
ME0274 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,039 | $14,259 | n/a |
ME0274 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,786 | $14,670 | n/a |
ME0274 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,882 | $825 | n/a |
ME0274 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,789 | $7,571 | n/a |
ME0274 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,182 | $500 | n/a |
ME0274 # 07 Y:1999 | 07 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $371 | $980 | n/a |
ME0274 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $100 | n/a |
ME0274 # 09 Y:1999 | 09 | 1999 | ELIMINATE/REDUCE AN OPERATION | $16,433 | $2,400 | n/a |
ME0274 # 10 Y:1999 | 10 | 1999 | MINIMIZE WATER USAGE | $1,674 | $868 | n/a |
ME0274 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $120 | $85 | n/a |
ME0269 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,778 | $56,288 | Implemented |
ME0269 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,324 | $1,000 | Implemented |
ME0269 # 03 Y:1999 | 03 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $12,357 | $32,660 | Not Implemented |