IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0283 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $792 $210 Not Implemented
ME0283 # 06 Y:2000 06 2000 METER WASTE WATER $853 $0 Not Implemented
ME0280 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $243,000 $20,108 Implemented
ME0280 # 02 Y:1999 02 1999 MOVE PRODUCT USING MECHANICAL MEANS $105,600 $6,000 Implemented
ME0280 # 03 Y:1999 03 1999 MODIFY CURRENT INCENTIVE PROGRAM $15,000 $0 Implemented
ME0280 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,958 $28,528 Implemented
ME0280 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,204 $1,000 Not Implemented
ME0280 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,402 $4,940 Implemented
ME0280 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,619 $1,000 Not Implemented
ME0280 # 08 Y:1999 08 1999 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,092 $1,240 Implemented
ME0280 # 09 Y:1999 09 1999 MODIFY CURRENT INCENTIVE PROGRAM $55,341 $30,500 Implemented
ME0274 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $27,426 $27,050 n/a
ME0274 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,039 $14,259 n/a
ME0274 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,786 $14,670 n/a
ME0274 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,882 $825 n/a
ME0274 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,789 $7,571 n/a
ME0274 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,182 $500 n/a
ME0274 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $371 $980 n/a
ME0274 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $100 n/a
ME0274 # 09 Y:1999 09 1999 ELIMINATE/REDUCE AN OPERATION $16,433 $2,400 n/a
ME0274 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $1,674 $868 n/a
ME0274 # 11 Y:1999 11 1999 MINIMIZE WATER USAGE $120 $85 n/a
ME0269 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,778 $56,288 Implemented
ME0269 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,324 $1,000 Implemented
ME0269 # 03 Y:1999 03 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $12,357 $32,660 Not Implemented