IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0125 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,007 $17,900 n/a
CW0125 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37,427 $1,156 n/a
CW0125 # 04 Y:2022 04 2022 USE SYNTHETIC LUBRICANT $18,816 $9,059 n/a
CW0125 # 05 Y:2022 05 2022 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $23,398 $56,000 n/a
CW0125 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $70,112 $8,000 n/a
CW0125 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,449 $25,995 n/a
CW0125 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $63,307 $41,871 n/a
CW0124 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,407 $100 n/a
CW0124 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,378 $47,373 n/a
CW0124 # 03 Y:2022 03 2022 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $230,341 $287,555 n/a
CW0124 # 04 Y:2022 04 2022 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,380 $0 n/a
CW0124 # 05 Y:2022 05 2022 MODIFY WORKLOAD $16,860 $0 n/a
CW0124 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929 $1,866 n/a
CW0124 # 07 Y:2022 07 2022 REPLACE TREATED WATER WITH WELL / SURFACE WATER $1,505 $2,582 n/a
UD1047 # 01 Y:2022 01 2022 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,359 $0 Implemented
UD1047 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $936 $0 Not Implemented
UD1047 # 03 Y:2022 03 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,243 $400 Implemented
UD1047 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $199 $44 Not Implemented
UD1047 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $671 $256 Not Implemented
UD1047 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,155 $1,552 Not Implemented
UD1047 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,755 $26,460 Implemented
UD1046 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,214 $200,000 Implemented
UD1046 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,323 $0 Not Implemented
UD1046 # 03 Y:2022 03 2022 IMPROVE COMBUSTION CONTROL CAPABILITY $261,813 $100 Not Implemented
UD1046 # 04 Y:2022 04 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $43,076 $3,500 Implemented