Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0177 # 09 Y:2021 | 09 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,497 | $100 | Implemented |
UU0177 # 10 Y:2021 | 10 | 2021 | INSTALL OCCUPANCY SENSORS | $1,441 | $1,625 | Not Implemented |
UU0178 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,811 | $1,300 | Not Implemented |
UU0178 # 02 Y:2021 | 02 | 2021 | INSULATE BARE EQUIPMENT | $8,654 | $3,913 | Not Implemented |
UU0178 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $4,347 | $9,400 | Not Implemented |
UU0178 # 04 Y:2021 | 04 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $99,244 | $320,000 | Not Implemented |
UU0178 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,197 | $9,700 | Not Implemented |
UU0178 # 06 Y:2021 | 06 | 2021 | Hire Energy Manager | $25,000 | $7,800 | Not Implemented |
UU0176 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $156,566 | $187,200 | Not Implemented |
UU0176 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $94,747 | $42,608 | Implemented |
UU0176 # 03 Y:2021 | 03 | 2021 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $29,753 | $10,400 | Implemented |
UU0176 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $23,470 | $21,270 | Not Implemented |
UU0176 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,766 | $7,600 | Implemented |
UU0176 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,012 | $22,700 | Not Implemented |
UU0176 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,411 | $5,700 | Implemented |
UU0173 # 01 Y:2021 | 01 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,037 | $2,000 | Not Implemented |
UU0173 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,743 | $3,188 | Implemented |
UU0173 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,755 | $8,095 | Implemented |
UU0173 # 04 Y:2021 | 04 | 2021 | INSULATE BARE EQUIPMENT | $1,355 | $594 | Not Implemented |
UU0173 # 05 Y:2021 | 05 | 2021 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,292 | $1,300 | Not Implemented |
UU0173 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,018 | $474 | Implemented |
UU0173 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $683 | $2,361 | Not Implemented |
UU0173 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $661 | $600 | Not Implemented |
UU0175 # 01 Y:2021 | 01 | 2021 | ELIMINATE/REDUCE AN OPERATION | $154,852 | $42,000 | Implemented |
UU0175 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $31,653 | $35,841 | Implemented |