Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0482 # 13 Y:2014 | 13 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,804 | $200 | Implemented |
WV0482 # 14 Y:2014 | 14 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $3,427 | $708 | Implemented |
WV0482 # 15 Y:2014 | 15 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,123 | $5,400 | Not Implemented |
WV0482 # 16 Y:2014 | 16 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $507 | $1,167 | Implemented |
NC0501 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $68,635 | $375 | Not Implemented |
NC0501 # 02 Y:2013 | 02 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $35,397 | $25,000 | Implemented |
NC0501 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,920 | $100 | Implemented |
NC0501 # 04 Y:2013 | 04 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,685 | $33,000 | Implemented |
NC0501 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $7,375 | $4,511 | Not Implemented |
NC0501 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $667 | $1,630 | Implemented |
NC0501 # 07 Y:2013 | 07 | 2013 | METER WASTE WATER | $3,326 | $4,200 | Implemented |
NC0501 # 08 Y:2013 | 08 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,569 | $4,000 | Not Implemented |
NC0501 # 09 Y:2013 | 09 | 2013 | INSULATE BARE EQUIPMENT | $867 | $660 | Not Implemented |
WV0468 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $20,196 | $57,000 | Not Implemented |
WV0468 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,596 | $31,932 | Implemented |
WV0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,882 | $2,000 | Not Implemented |
WV0468 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,463 | $29,680 | Implemented |
WV0468 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,865 | $3,830 | Implemented |
WV0468 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,088 | $5,770 | Implemented |
WV0468 # 07 Y:2013 | 07 | 2013 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,362 | $11,000 | Implemented |
WV0468 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,416 | $5,160 | Not Implemented |
WV0468 # 09 Y:2013 | 09 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,020 | $1,000 | Not Implemented |
WV0468 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $731 | $225 | Implemented |
WV0468 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $496 | $30 | Implemented |
WV0468 # 12 Y:2013 | 12 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $452 | $1,125 | Implemented |