Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0578 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $380 | $3,990 | Implemented |
CO0578 # 02 Y:2005 | 02 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,500 | $780 | Implemented |
CO0578 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $760 | $1,750 | Not Implemented |
CO0578 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $370 | $1,240 | Not Implemented |
CO0578 # 05 Y:2005 | 05 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $39,590 | $89,600 | Not Implemented |
CO0578 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,700 | $47,250 | Not Implemented |
CO0578 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $1,670 | $2,880 | Not Implemented |
CO0577 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $141,620 | $513,000 | Not Implemented |
CO0577 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $135,890 | $303,800 | Implemented |
CO0577 # 03 Y:2005 | 03 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $89,400 | $41,000 | Implemented |
CO0577 # 04 Y:2005 | 04 | 2005 | MODIFY WORKLOAD | $48,020 | $360 | Implemented |
CO0577 # 05 Y:2005 | 05 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $3,420 | $6,000 | Implemented |
CO0577 # 06 Y:2005 | 06 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $270 | $340 | Implemented |
CO0577 # 07 Y:2005 | 07 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $810 | $3,070 | Not Implemented |
CO0577 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,530 | $150,890 | Not Implemented |
WV0328 # 01 Y:2005 | 01 | 2005 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $89,602 | $72,720 | Not Implemented |
WV0328 # 02 Y:2005 | 02 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,992 | $0 | Not Implemented |
WV0328 # 03 Y:2005 | 03 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,942 | $18,000 | Implemented |
WV0328 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,040 | $60 | Implemented |
WV0328 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $948 | $0 | Implemented |
WV0328 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $649 | $30 | Not Implemented |
WV0328 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $646 | $278 | Implemented |
WV0328 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $406 | $430 | Not Implemented |
WV0328 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397 | $120 | Implemented |
WV0328 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $282 | $1,530 | Implemented |