IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0768 # 03 Y:2007 03 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,780 $20,512 Not Implemented
UD0768 # 04 Y:2007 04 2007 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,081 $4,600 Not Implemented
UD0768 # 05 Y:2007 05 2007 REPLACE BOILER $5,791 $40,000 Not Implemented
UD0768 # 06 Y:2007 06 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,131 $1,000 Not Implemented
UD0768 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $2,180 $0 Implemented
UD0768 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $1,410 $400 Not Implemented
UD0768 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $0 Implemented
TT0013 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $60,000 $180,000 Not Implemented
TT0013 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,410 $10,550 Not Implemented
TT0013 # 03 Y:2007 03 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $235,000 $425,000 Not Implemented
TT0013 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,523 $88,373 Not Implemented
TT0013 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,555 $60,943 Not Implemented
CO0608 # 01 Y:2007 01 2007 UPGRADE CONTROLS ON COMPRESSORS $11,650 $56,600 Implemented
CO0608 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,500 Implemented
CO0608 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $60 Implemented
CO0608 # 04 Y:2007 04 2007 REPLACE BOILER $23,660 $20,000 Implemented
CO0608 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $340 $1,370 Implemented
SD0399 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,380 $6,025 Implemented
SD0399 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,267 $6,700 Not Implemented
SD0399 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,543 $4,247 Not Implemented
SD0399 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $5,934 Implemented
SD0399 # 05 Y:2007 05 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,129 $0 Not Implemented
DL0008 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $40,014 $14,000 Implemented
DL0008 # 02 Y:2007 02 2007 REPLACE BOILER $33,159 $102,000 Not Implemented
DL0008 # 03 Y:2007 03 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,900 $0 Implemented