IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0679 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,613 $47,385 Implemented
OR0679 # 06 Y:2016 06 2016 REPLACE BOILER $48,912 $250,000 Not Implemented
MI0303 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,192 $28,975 Implemented
MI0303 # 02 Y:2016 02 2016 MINIMIZE WATER USAGE $6,896 $7,439 Implemented
MI0303 # 03 Y:2016 03 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,338 $4,536 Not Implemented
MI0303 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,274 $760 Implemented
MI0303 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,502 $40 Not Implemented
MI0303 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,425 $10,408 Implemented
MI0303 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,786 $639 Implemented
MI0303 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $1,217 $1,149 Implemented
MI0303 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $3,585 Implemented
MI0303 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $879 $1,660 Implemented
MI0303 # 11 Y:2016 11 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $541 $420 Not Implemented
MI0303 # 12 Y:2016 12 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $325 $173 Implemented
MI0303 # 13 Y:2016 13 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $190 $80 Implemented
NC0580 # 01 Y:2016 01 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,781 $4,200 Not Implemented
NC0580 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $100 Implemented
NC0580 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,544 $29,200 Implemented
NC0580 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $110 $400 Not Implemented
NC0580 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $434 $150 Not Implemented
NC0580 # 06 Y:2016 06 2016 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,084 $50 Not Implemented
NC0580 # 07 Y:2016 07 2016 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,280 $1,300 Not Implemented
NC0580 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $9,207 Implemented
NC0580 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $67 $100 Implemented
NC0577 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,300 $135,630 Not Implemented