IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0069 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,274 $835 Implemented
LM0069 # 09 Y:2004 09 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,301 $2,241 Implemented
LM0069 # 10 Y:2004 10 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,358 $10,398 Implemented
LM0069 # 11 Y:2004 11 2004 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $1,588 $18 Implemented
LM0069 # 12 Y:2004 12 2004 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $170,219 $0 Implemented
LM0069 # 13 Y:2004 13 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $16,000 $5,000 Not Implemented
LM0069 # 14 Y:2004 14 2004 INSTALL SYSTEM TO COLLECT SCRAP $118,125 $68,000 Not Implemented
LM0069 # 15 Y:2004 15 2004 MODIFY WORKLOAD $7,000 $1,000 Not Implemented
LM0069 # 16 Y:2004 16 2004 DEVELOP STANDARD OPERATING PROCEDURES $86,625 $14,470 Implemented
LM0069 # 17 Y:2004 17 2004 DEVELOP STANDARD OPERATING PROCEDURES $79,714 $5,400 Implemented
MA0546 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $16,130 $4,480 Not Implemented
MA0546 # 02 Y:2004 02 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,348 $4,712 n/a
MA0546 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $11,157 $1,992 Not Implemented
MA0546 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $7,495 $1,200 Implemented
MA0546 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,827 $4,972 Implemented
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,839 $282 Not Implemented
MA0546 # 08 Y:2004 08 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $981 $720 Not Implemented
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
NC0276 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,019 $18,000 Not Implemented
NC0276 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $14,986 $16,406 Not Implemented
NC0276 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $18,000 $8,050 Implemented
NC0276 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $14,713 $3,487 Not Implemented
NC0276 # 05 Y:2004 05 2004 DEVELOP A REPAIR/REPLACE POLICY $1,432 $1,085 Implemented
NC0276 # 06 Y:2004 06 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,405 $5,000 Not Implemented