Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0069 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,274 | $835 | Implemented |
LM0069 # 09 Y:2004 | 09 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,301 | $2,241 | Implemented |
LM0069 # 10 Y:2004 | 10 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $6,358 | $10,398 | Implemented |
LM0069 # 11 Y:2004 | 11 | 2004 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $1,588 | $18 | Implemented |
LM0069 # 12 Y:2004 | 12 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $170,219 | $0 | Implemented |
LM0069 # 13 Y:2004 | 13 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $16,000 | $5,000 | Not Implemented |
LM0069 # 14 Y:2004 | 14 | 2004 | INSTALL SYSTEM TO COLLECT SCRAP | $118,125 | $68,000 | Not Implemented |
LM0069 # 15 Y:2004 | 15 | 2004 | MODIFY WORKLOAD | $7,000 | $1,000 | Not Implemented |
LM0069 # 16 Y:2004 | 16 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $86,625 | $14,470 | Implemented |
LM0069 # 17 Y:2004 | 17 | 2004 | DEVELOP STANDARD OPERATING PROCEDURES | $79,714 | $5,400 | Implemented |
MA0546 # 01 Y:2004 | 01 | 2004 | INSTALL OCCUPANCY SENSORS | $16,130 | $4,480 | Not Implemented |
MA0546 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $13,348 | $4,712 | n/a |
MA0546 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $11,157 | $1,992 | Not Implemented |
MA0546 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $7,495 | $1,200 | Implemented |
MA0546 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,827 | $4,972 | Implemented |
MA0546 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,243 | $3,230 | Implemented |
MA0546 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,839 | $282 | Not Implemented |
MA0546 # 08 Y:2004 | 08 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $981 | $720 | Not Implemented |
MA0546 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $832 | $3,000 | Implemented |
NC0276 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,019 | $18,000 | Not Implemented |
NC0276 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,986 | $16,406 | Not Implemented |
NC0276 # 03 Y:2004 | 03 | 2004 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $18,000 | $8,050 | Implemented |
NC0276 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $14,713 | $3,487 | Not Implemented |
NC0276 # 05 Y:2004 | 05 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,432 | $1,085 | Implemented |
NC0276 # 06 Y:2004 | 06 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,405 | $5,000 | Not Implemented |