IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0677 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $112 $131 Implemented
OK0677 # 05 Y:2004 05 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,838 $2,000 Implemented
OK0677 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,275 $15,280 Not Implemented
OK0677 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $996 $5,100 Not Implemented
OK0677 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $505 Not Implemented
UF0336 # 01 Y:2004 01 2004 INSTALL SKYLIGHTS $19,224 $20,117 Not Implemented
UF0336 # 02 Y:2004 02 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $16,196 $39,000 Not Implemented
UF0336 # 03 Y:2004 03 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,074 $25,200 Implemented
UF0336 # 04 Y:2004 04 2004 INSTALL TIMERS AND/OR THERMOSTATS $8,379 $2,000 Implemented
UF0336 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,739 $2,513 Implemented
UF0336 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,944 $70 Not Implemented
UF0336 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,079 $1,400 Implemented
UM0246 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,080 $26,630 Not Implemented
UM0246 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $6,140 $700 Implemented
UM0246 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,885 $100 Implemented
UM0246 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,380 $500 Implemented
UM0246 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,165 $2,000 Not Implemented
UM0246 # 06 Y:2004 06 2004 ADD AREA LIGHTING SWITCHES $620 $600 Not Implemented
LE0178 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,185 $6,000 Not Implemented
LE0178 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,795 $75,903 Not Implemented
LE0178 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,543 $750 Not Implemented
LE0178 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,515 $300 Not Implemented
LE0178 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,757 $720 Not Implemented
LE0178 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,940 $0 Not Implemented
LE0178 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,837 $2,500 Not Implemented