IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0066 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $483 $0 Implemented
WV0066 # 04 Y:1995 04 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,294 $7,445 Not Implemented
WV0065 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,959 $832 Implemented
WV0065 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $800 Implemented
WV0065 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $1,316 $300 Implemented
WV0065 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $870 $510 Not Implemented
WV0065 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $880 $513 Implemented
WV0065 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $9,848 $8,003 Implemented
WV0065 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,650 $5,000 Not Implemented
WV0065 # 08 Y:1995 08 1995 INSTALL TURBULATORS $1,291 $1,040 Not Implemented
WV0065 # 09 Y:1995 09 1995 OPTIMIZE PLANT POWER FACTOR $2,515 $5,545 Not Implemented
WV0064 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,055 $630 Implemented
WV0064 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $14,990 $3,690 Not Implemented
WV0064 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,062 $500 Implemented
WV0064 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $863 $480 Implemented
WV0064 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,577 $35 Not Implemented
WV0064 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $6,143 $2,745 Implemented
WV0064 # 07 Y:1995 07 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $150 $255 Not Implemented
WV0064 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $544 $180 Implemented
WV0064 # 09 Y:1995 09 1995 ELIMINATE/REDUCE AN OPERATION $7,837 $0 Not Implemented
WV0062 # 01 Y:1995 01 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,196 $2,330 Implemented
WV0062 # 02 Y:1995 02 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,611 $5,068 Not Implemented
WV0062 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $469 $800 Implemented
WV0062 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $296 $0 Implemented
WV0060 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $472 $0 Implemented