Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0561 # 05 Y:1999 | 05 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,139 | $3,000 | Not Implemented |
UD0561 # 06 Y:1999 | 06 | 1999 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $942 | $3,000 | Not Implemented |
UD0561 # 07 Y:1999 | 07 | 1999 | ADD AREA LIGHTING SWITCHES | $877 | $0 | Not Implemented |
AM0342 # 01 Y:1999 | 01 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,670 | $11,000 | Not Implemented |
AM0342 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,835 | $14,900 | Not Implemented |
AM0342 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $475 | $20 | Not Implemented |
AM0342 # 04 Y:1999 | 04 | 1999 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $285 | $270 | Not Implemented |
AM0342 # 05 Y:1999 | 05 | 1999 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $259 | $0 | Not Implemented |
AM0342 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $261 | $40 | Implemented |
AM0342 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170 | $250 | Not Implemented |
HO0193 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,758 | $16,993 | Implemented |
HO0193 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $785 | $1,000 | Implemented |
HO0193 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,524 | $360 | Implemented |
HO0193 # 04 Y:1999 | 04 | 1999 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $395 | $400 | Implemented |
HO0193 # 05 Y:1999 | 05 | 1999 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $825 | $2,000 | Implemented |
HO0193 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000 | $300 | Implemented |
HO0193 # 07 Y:1999 | 07 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,872 | $3,500 | Not Implemented |
HO0193 # 08 Y:1999 | 08 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $2,000 | $10,000 | Not Implemented |
HO0193 # 09 Y:1999 | 09 | 1999 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $5,000 | $3,000 | Not Implemented |
SD0212 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $896 | $0 | Not Implemented |
SD0212 # 02 Y:1999 | 02 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,608 | $16,000 | Not Implemented |
SD0212 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $51,749 | $13,000 | Not Implemented |
SD0212 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,696 | $0 | Implemented |
SD0212 # 05 Y:1999 | 05 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,440 | $3,840 | Implemented |
SD0212 # 06 Y:1999 | 06 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $990 | $0 | Not Implemented |