Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0316 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,722 | $0 | Implemented |
WV0316 # 09 Y:2005 | 09 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,491 | $60 | Implemented |
WV0316 # 10 Y:2005 | 10 | 2005 | INSULATE BARE EQUIPMENT | $825 | $141 | Implemented |
WV0316 # 11 Y:2005 | 11 | 2005 | INSULATE BARE EQUIPMENT | $783 | $70 | Implemented |
WV0316 # 12 Y:2005 | 12 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $552 | $345 | Implemented |
UD0720 # 01 Y:2005 | 01 | 2005 | USE MINIMUM STEAM OPERATING PRESSURE | $6,931 | $0 | Not Implemented |
UD0720 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,769 | $0 | Implemented |
UD0720 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,870 | $6,000 | Implemented |
UD0720 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,757 | $3,200 | Implemented |
UD0720 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,200 | $225 | Implemented |
UD0720 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,280 | $540 | Implemented |
UD0720 # 07 Y:2005 | 07 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $1,655 | $0 | Not Implemented |
UD0720 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,333 | $5,120 | Not Implemented |
UD0720 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,103 | $400 | Not Implemented |
UD0720 # 10 Y:2005 | 10 | 2005 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,072 | $2,000 | Implemented |
UD0720 # 11 Y:2005 | 11 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $554 | $0 | Implemented |
UD0720 # 12 Y:2005 | 12 | 2005 | INSULATE BARE EQUIPMENT | $483 | $379 | Not Implemented |
UD0720 # 13 Y:2005 | 13 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $390 | $0 | Implemented |
UD0720 # 14 Y:2005 | 14 | 2005 | USE PHOTOCELL CONTROLS | $296 | $500 | Not Implemented |
UD0720 # 15 Y:2005 | 15 | 2005 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $200 | $340 | Implemented |
UM0280 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,334 | $24,499 | Not Implemented |
UM0280 # 02 Y:2005 | 02 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,174 | $11,550 | Not Implemented |
UM0280 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,277 | $35 | Implemented |
UM0280 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,274 | $1,680 | Not Implemented |
UM0280 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $2,086 | $128 | Implemented |