IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0183 # 06 Y:1996 06 1996 UPGRADE CONVEYORS $5,339 $6,100 Implemented
ME0183 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,206 $6,000 Implemented
ME0183 # 08 Y:1996 08 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,000 $9,500 Implemented
ME0183 # 09 Y:1996 09 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,133 $0 Implemented
ME0183 # 10 Y:1996 10 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,107 $0 Implemented
OK0490 # 01 Y:1996 01 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,884 $9,000 Implemented
OK0490 # 02 Y:1996 02 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $29,136 $12,600 Implemented
OK0490 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $4,125 Implemented
OK0490 # 04 Y:1996 04 1996 METER WASTE WATER $678 $1,800 Not Implemented
OK0490 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20 $50 Implemented
AR0076 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,799 $2,705 Implemented
AR0076 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,417 $2,610 Implemented
AR0076 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $130 Implemented
AR0076 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $780 $50 Implemented
AR0076 # 05 Y:1996 05 1996 REPAIR AND ELIMINATE STEAM LEAKS $707 $160 Implemented
AR0076 # 06 Y:1996 06 1996 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $17,612 $28,000 Not Implemented
AR0076 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $1,845 $1,845 Not Implemented
AR0076 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $620 $140 Implemented
AR0076 # 09 Y:1996 09 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $11,168 $3,000 Implemented
AR0076 # 10 Y:1996 10 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,240 $3,440 Implemented
AR0076 # 11 Y:1996 11 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $204 $0 Implemented
UL0153 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $265 $6,150 Not Implemented
UL0153 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68 $227 Not Implemented
UL0153 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,723 $85 Implemented
UL0153 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,786 $80 Not Implemented