Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0432 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $321 | $30 | Implemented |
UM0131 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,173 | $10,972 | n/a |
UM0131 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $616 | $1,400 | n/a |
UM0131 # 03 Y:1999 | 03 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,228 | $0 | n/a |
UM0131 # 04 Y:1999 | 04 | 1999 | INSTALL / REPAIR INSULATION ON STEAM LINES | $202 | $510 | n/a |
UM0131 # 05 Y:1999 | 05 | 1999 | REPAIR OR REPLACE STEAM TRAPS | $2,646 | $5,280 | n/a |
UM0131 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF CONDENSATE RETURNED | $14,658 | $6,690 | n/a |
UM0131 # 07 Y:1999 | 07 | 1999 | METER WASTE WATER | $2,154 | $500 | n/a |
UM0131 # 08 Y:1999 | 08 | 1999 | CLEAR AND RENT EXISTING SPACE | $63,991 | $63,991 | n/a |
UF0217 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,327 | $1,400 | Implemented |
UF0217 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $378 | $3,641 | Implemented |
UF0217 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,574 | $6,750 | Not Implemented |
UF0217 # 04 Y:1999 | 04 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $41,712 | $39,500 | Implemented |
UF0217 # 05 Y:1999 | 05 | 1999 | METER WASTE WATER | $1,261 | $1,500 | Not Implemented |
UF0217 # 06 Y:1999 | 06 | 1999 | APPLY FOR INVESTMENT INCENTIVES | $18,174 | $50 | Not Implemented |
SD0211 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $785 | $0 | Not Implemented |
SD0211 # 02 Y:1999 | 02 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,261 | $0 | Not Implemented |
SD0211 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,358 | $6,750 | Not Implemented |
SD0211 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,102 | $2,000 | Not Implemented |
SD0211 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $36,281 | $5,000 | Not Implemented |
SD0211 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,700 | $370 | Not Implemented |
SD0211 # 07 Y:1999 | 07 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $25,400 | $10,000 | Implemented |
SD0211 # 08 Y:1999 | 08 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $22,360 | $3,000 | Implemented |
SD0211 # 09 Y:1999 | 09 | 1999 | REDUCE SCRAP PRODUCTION | $97,975 | $0 | Implemented |
DS0127 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,707 | $13,320 | Implemented |