IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0045 # 01 Y:2003 01 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $27,670 $800 Implemented
TA0045 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,140 $200 Implemented
TA0045 # 03 Y:2003 03 2003 PAY UTILITY BILLS ON TIME $1,990 $0 Implemented
TA0045 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $3,230 Implemented
TA0045 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $370 $0 Implemented
TA0045 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $520 $145 Not Implemented
TA0045 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $445 Implemented
TA0045 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $200 $0 Not Implemented
LL0151 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,605 $4,350 Implemented
LL0151 # 02 Y:2003 02 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,140 $4,600 Not Implemented
LL0151 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $10,108 $1,092 Not Implemented
LL0151 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $5,710 $494 Not Implemented
LL0151 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $3,410 $1,240 Implemented
LL0151 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,284 $180 Implemented
LL0151 # 07 Y:2003 07 2003 FILTER AND REUSE HYDRAULIC OIL $40,689 $8,000 Implemented
LL0151 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,556 $12,425 Implemented
UU0037 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,120 $0 Not Implemented
UU0037 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $420 Not Implemented
UU0037 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $1,896 $2,861 Not Implemented
UU0037 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $20 Not Implemented
UU0037 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $230 Not Implemented
SU0149 # 01 Y:2003 01 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $360,580 $1,153,710 Not Implemented
SU0149 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $30,833 $30,000 Not Implemented
SU0149 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $7,864 $4,382 Not Implemented
SU0149 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $3,295 $6,573 Not Implemented