IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0127 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $300 Implemented
DS0127 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $883 $692 Not Implemented
DS0127 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,048 $38 Not Implemented
DS0127 # 05 Y:1999 05 1999 MINIMIZE WATER USAGE $655 $520 Not Implemented
DS0127 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,045 $20,000 Not Implemented
MA0431 # 01 Y:1999 01 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,010 $21,612 Not Implemented
MA0431 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,201 $18,690 Implemented
MA0431 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,159 $7,290 Not Implemented
MA0431 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,860 $0 Implemented
MA0431 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $642 $2,137 Implemented
UM0130 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $662 $0 Not Implemented
UM0130 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,970 $0 Implemented
UM0130 # 03 Y:1999 03 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,200 $3,500 Not Implemented
UM0130 # 04 Y:1999 04 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,820 $0 Implemented
UM0130 # 05 Y:1999 05 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,807 $0 Not Implemented
UM0130 # 06 Y:1999 06 1999 EXPAND OPERATIONS INTO UNUSED SPACE $65,700 $123,450 Not Implemented
WI0338 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $15,106 $0 n/a
WI0338 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,524 $20,900 n/a
WI0338 # 03 Y:1999 03 1999 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,369 $7,590 n/a
WI0338 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $2,410 $7,200 n/a
WI0338 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,072 $210 n/a
WI0338 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $434 $640 n/a
WI0338 # 07 Y:1999 07 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,906 $6,000 n/a
WI0338 # 08 Y:1999 08 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,671 $0 n/a
WI0338 # 09 Y:1999 09 1999 LEASE EQUIPMENT INSTEAD OF PURCHASING $828 $0 n/a