Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
906
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0041 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,000 | $180 | Not Implemented |
BS0041 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $988 | $5,580 | Not Implemented |
BS0041 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $156 | $480 | Not Implemented |
BS0041 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,010 | $3,900 | Not Implemented |
BS0041 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,476 | $15 | Not Implemented |
BS0041 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $398 | $722 | Not Implemented |
BS0041 # 08 Y:2014 | 08 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $930 | $285 | Not Implemented |
BS0041 # 09 Y:2014 | 09 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $118 | $292 | Not Implemented |
BS0041 # 10 Y:2014 | 10 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,324 | $15,600 | Not Implemented |
BS0041 # 11 Y:2014 | 11 | 2014 | INSULATE BARE EQUIPMENT | $436 | $1,128 | Not Implemented |
BS0036 # 01 Y:2014 | 01 | 2014 | USE OPTIMUM THICKNESS INSULATION | $17,744 | $26,100 | Not Implemented |
BS0036 # 02 Y:2014 | 02 | 2014 | INSTALL REPLACEMENT DOORS | $4,556 | $17,436 | Not Implemented |
BS0036 # 03 Y:2014 | 03 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $16,582 | $31,134 | Not Implemented |
BS0036 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,961 | $10,130 | Not Implemented |
BS0036 # 05 Y:2014 | 05 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,250 | $11,371 | Not Implemented |
BS0036 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,963 | $937 | Implemented |
BS0036 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,898 | $2,032 | Implemented |
BS0040 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,421 | $2,496 | Not Implemented |
BS0040 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,977 | $470 | Not Implemented |
BS0040 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $887 | $2,075 | Implemented |
BS0040 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $722 | Implemented |
BS0040 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $316 | $464 | Not Implemented |
BS0040 # 06 Y:2014 | 06 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $232 | $221 | Not Implemented |
BS0040 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $610 | $360 | Not Implemented |
BS0040 # 08 Y:2014 | 08 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $122 | $95 | Not Implemented |