IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0553 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,431 $10,658 Implemented
WV0553 # 01 Y:2017 01 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,992 $112,000 Not Implemented
LE0445 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,107 $1,000 Implemented
LE0445 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,590 $1,500 Implemented
LE0445 # 03 Y:2017 03 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,163 $3,000 Not Implemented
LE0445 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $750 Implemented
LE0445 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $6,692 Implemented
UK1708 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,813 $31,719 Not Implemented
UK1708 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,465 $26,520 Not Implemented
UK1708 # 03 Y:2017 03 2017 UPGRADE OBSOLETE EQUIPMENT $2,904 $0 Not Implemented
UK1708 # 04 Y:2017 04 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,895 $0 Not Implemented
UK1708 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $1,253 Not Implemented
UK1708 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $461 $762 Not Implemented
UK1708 # 07 Y:2017 07 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $217 $0 Implemented
UK1708 # 08 Y:2017 08 2017 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $333 $0 Not Implemented
UK1708 # 09 Y:2017 09 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $22,096 $78,750 Not Implemented
CL1703 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,383 $20,450 Implemented
CL1703 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $28,843 $0 Implemented
CL1703 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,735 $0 Not Implemented
CL1703 # 04 Y:2017 04 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,100 $2,000 Implemented
SF0510 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $494 $90 Implemented
SF0510 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $44,781 $7,188 Not Implemented
SF0510 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,182 $12,002 Implemented
SF0510 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,454 $9,120 Implemented
SF0510 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,192 $3,095 Implemented