Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0292 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $460 | $1,000 | Implemented |
MZ0292 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $5,000 | Implemented |
MZ0292 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,892 | $4,700 | Not Implemented |
MZ0292 # 05 Y:2020 | 05 | 2020 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $130 | $50 | Implemented |
MZ0292 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,704 | $59,378 | Not Implemented |
MZ0292 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,874 | $22,200 | Not Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |
MZ0292 # 09 Y:2020 | 09 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,588 | $240 | Implemented |
MZ0292 # 10 Y:2020 | 10 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,760 | $45,300 | Not Implemented |
MZ0292 # 11 Y:2020 | 11 | 2020 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $147,061 | $38,160 | Not Implemented |
MZ0292 # 12 Y:2020 | 12 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,528 | $502,000 | Implemented |
MZ0292 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,837 | $450 | Implemented |
AS0493 # 01 Y:2020 | 01 | 2020 | COMBINE UTILITY METERS | $21,443 | $1,473 | Implemented |
AS0493 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,179 | $8,066 | Implemented |
AS0493 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,788 | $3,941 | Implemented |
AS0493 # 04 Y:2020 | 04 | 2020 | KEEP EQUIPMENT CLEAN | $1,693 | $2,174 | Implemented |
AS0493 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,045 | $2,451 | Implemented |
AS0494 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $130,212 | $564 | Implemented |
AS0494 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,021 | $31,867 | Implemented |
AS0494 # 03 Y:2020 | 03 | 2020 | KEEP EQUIPMENT CLEAN | $3,890 | $2,174 | Implemented |
AS0494 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $3,827 | $2,905 | Implemented |
AS0494 # 05 Y:2020 | 05 | 2020 | COMBINE UTILITY METERS | $3,107 | $1,473 | Implemented |
AS0494 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $518 | $382 | Implemented |
AS0494 # 07 Y:2020 | 07 | 2020 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $226 | $354 | Not Implemented |
AS0494 # 08 Y:2020 | 08 | 2020 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $61 | $47 | Implemented |